It isn't a process, nor a prescription to be followed. This effort involved more than 200 industry and academic experts. In response, the government funded a two-year project to create a single, extensible framework that integrated systems engineering, software engineering, and product development. ![]() The proliferation of new models was confusing. Its success led to the development of CMMs for a variety of subjects beyond software. Applied mainly to defense programs, CMM achieved considerable adoption and underwent several revisions. Both the name, Capability Maturity Model, and the Staged Representation five levels were inspired by Crosby's Manufacturing Maturity Model. The model also built upon research at International Business Machines (IBM) Corporation and 20th-century quality assurance leaders such as Philip Crosby and W. First published in 1991, the CMM for Software began as a checklist of critical success factors. SEI is a research center at Carnegie-Mellon University, which was established and funded by the United States Department of Defense. ![]() The CMMI began in 1987 as the Capability Maturity Model (CMM), a project at the Software Engineering Institute (SEI). No plans exist at this time to update this content to support later versions. The guidance provided here is based on version 1.3 for CMMI and supports the CMMI process available with Azure DevOps.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |